01-12
2023
1440PSI three-phase separator in stock for sale
At present, our factory has a three-phase separator in stock, which conforms to ASME standards. The vessel is designed for high pressure, acid gas, and is suitable for well testing and production.
01-05
HC won the order of Atmospheric Gauge Tank for Russian project
At the beginning of the New Year, good news came from HC Foreign Trade Department. After several rounds of communications, we have reached cooperation with Russian customers on the atmospheric gauge tank project, which gets off
12-27
2022
Vertical three-phase separator completed unloading in Thailand
The HC vertical three-phase separator provided for Thailand project was successfully delivered and unloaded. Customers sent photos of the unloading process and expressed their satisfaction with the
12-07
The increasingly high domestic demand for water bath heater (WBH)
As the temperature plummeted, domestic customers began to order a large number of WBH. This equipment is mainly used to heat crude oil or natural gas to the temperature required during the process of oil and gas gathering and
11-25
Thailand 3-phase separator & choke manifold are ready to be packaged for shipment
Three-phase separator and choke manifold ordered by Thai customers have been fully completed and can be delivered after packaging.
11-15
Successful delivery of 2 natural gas three-phase separators
Under the indefinite epidemic, to guarantee the on-schedule production of orders, 2 units of three-phase natural gas separators were successfully shipped after nearly a week's efforts of all HC workers.
10-28
Successful delivery of high-pressure pipeline for Project in Turkey
Turkish customer has ordered a batch of high-pressure pipeline and blowing tank from us. After days of production, all pipelines have been completed and successfully delivered on October 22th.
10-20
Sand-blasting of surge tank for Nigerian project has been fully completed
After intensive and orderly production, the surge tank for Nigerian project has successfully entered the stage of pressure testing.