https://hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

04-14

2020

Application of gas/liquid separator in natural gas wellhead

The gas/liquid separator is mainly used to separate the gas/liquid mixture in the process, which is widely used in petroleum, chemical, natural gas treatment and other industries. In the case that only gas and liquid are required to be

04-10

2020

Two-phase vertical test separator skid for gas wells

The purpose of two-phase test separators is to separate well stream into two phases; liquids and gas. Test separator, either horizontal or vertical, separate fluids by applying gravitational force. Special separator internals are used to

04-09

2020

Packing process of HC petroleum equipment pressure vessel

HC petroleum equipment has very complete facilities and specifications in the shipment of pressure vessels. We are committed to providing users with the best equipment and services.

04-08

2020

Middle East customer orders three-phase separator from HC

After times of communications, the Middle East customer has decided to sign the order agreement of the three-phase separator with us. More details are still under further negotiation.Affected by the epidemic, this communication lasted

04-03

2020

How to choose the appropriate wellhead desander for oil & gas fields

With the intensification of oil and gas field exploitation, the problem of sand production is becoming increasingly serious. In particular, high-yield gas wells have caused great harm to the surface gathering and processing systems, such as

04-01

2020

Description of Line Heater supplied by HC

HC Petroleum Equipment designs and supplies cost-effective and quality line heaters for oilfield and gas processing facilities. Line heaters are mechanical equipment with heating function that are widely used in well testing, early production facilities

03-30

2020

Structure & working principle of three-phase separator

The three-phase separator is a commonly used equipment for oil field development and production. With the continuous intensification of exploitation, oil and gas resources are becoming less and less. How to provide more energy with

03-26

2020

Choke Manifolds – meeting your quality requirements and customized skid design

HC Petroleum Equipment provides 4-Valve and 5-Valve Choke Manifolds as per your requirements. Choke Manifolds for 5000 psi, 10000 psi and 15000 psi we have in stock.Choke Our Manifolds

<< 1 ... 37 38 39 40 41 ... 53 >>

(©) 2019-2025 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US