07-14
2021
Dongying customers placed an order for two 1,000,000m3 three-phase separators
Recently, customers from Shandong visited HC factory and signed an order agreement for two 1,000,000m3 three-phase separators.
07-08
Domestic customers order skid-mounted three-phase separator and cyclone desander
Recently, customers in Tianjin, China signed an order agreement with HC for three-phase separator and desander. At present, the factory is working overtime on the production.
07-03
T/T2449 vertical heat exchanger for Russia is ready
The vertical heat exchanger designed and manufactured by HC for Russian project has been completed and is ready for loading and delivery.
06-29
Two Cyclone Desanders for Kazakhstan Project by HC
Two cyclone desanders designed and manufactured by HC for Kazakhstan project have been completed and are ready to be loaded and shipped.
06-23
Vehicle-mounted two-phase mobile separator has been successfully delivered to northern Shaanxi and put into production
The two-phase mobile separator designed and manufactured by HC for customers in Northern Shaanxi, China has been successfully delivered and put into use on site.
06-15
Vertical crude-oil surge tank delivered successfully
The vertical surge tank ordered by domestic customer has been successfully delivered recently and has arrived at the customer’s site for trial operation.
06-07
vehicle-mounted surface test equipment for South Africa project
Recently, HC received an inquiry from a customer in South Africa for a complete set of surface test equipment to be installed on a trailer.
06-02
Horizontal oil-gas-water three-phase separator sent to Yan'an, China
The horizontal oil-gas-water three-phase separator ordered by customer in Yan'an, Shaanxi Province, was successfully delivered on May 28.