https://hcpetroleum.hk/m/images/logo.jpg
ALL
  • All
  • Company News
  • Industry News

01-05

2026

Oil and Gas Separators RFQ: What Information Should Be Provided to the Manufacturer?

From HC’s experience working with operators and EPC contractors, the efficiency of the quotation and technical evaluation process depends largely on whether the right information is prepared and shared upfront.

01-04

2026

Three Phase Separator Selection: Practical Considerations from Field Experience

In many cases, unstable liquid levels, intermittent carryover, or downstream fouling are not caused by poor operation, but by design assumptions that did not fully reflect how the well would actually produce.

12-31

2025

Customized Desander Package for Kazakhstan Oilfield Applications

In oil and gas field surface facilities, one of the most frequently asked questions from operators is simple but critical: how to remove sand efficiently without affecting system stability.

12-29

2025

Customized Shell and Tube Heat Exchanger for Syria Project

HC has recently completed the design and fabrication of a customized shell and tube heat exchanger for a client in Syria.The equipment was specifically engineered to meet the project’s operating conditions and site requirements

12-23

2025

Three-Phase Separator for Nigeria Project – Manufacturing Progress and Design Considerations

The unit has completed the main vessel fabrication and primary piping installation and is now progressing steadily through the remaining manufacturing stages in accordance with the project schedule.

12-18

2025

HC Completes Manufacturing of Vertical Desander Pressure Vessel for Angola Oilfield Project

HC has completed the manufacturing of a vertical desander pressure vessel for an oilfield project in Angola. Designed for efficient solid removal in oilfield surface processing systems.

12-10

2025

HC Delivers Pressurized Explosion-Proof Laboratory Cabin for UAE Well Testing Operations

As part of our ongoing work in the Middle East, HC recently completed the delivery of a pressurized explosion-proof laboratory cabin for a well testing project in the United Arab Emirates.

12-02

2025

Vertical Surge Tank & Transfer Pump Skid Delivered for Oilfield Liquid Handling Operations

HC recently supplied a Vertical Surge Tank together with a Transfer Pump Skid for an overseas oilfield project. The equipment has been delivered to the client’s production base and is currently being prepared for field installation.

<< 1 2 3 4 ... 60 >>

(©) 2019-2026 All Rights Reserved HK HUICHUAN INTERNATIONAL PETROLEUM EQUIPMENT CO., LTD.

HOME PRODUCTS CONTACTS
  • HOME
  • PRODUCTS
  • PROJECTS
  • SOLUTION
  • SERVICE
  • ABOUT US
  • NEWS
  • CONTACT US