-
In 2021, as the continuous rise of international oil price, the exploration and exploitation activities of domestic oil and gas industry also become increasingly active.
READ MORE
-
The vehicle-mounted three-phase separator ordered by the customer in Inner Mongolia has been produced and is ready to be loaded and sent to Ordos.
READ MORE
-
The vehicle-mounted integrated two-phase separator ordered by Jilin customer, China, has been basically completed, which can be delivered after the assembly and painting of the parts.
READ MORE
-
As the main gas source of Beijing-Tianjin-Hebei region in China, Dagang Oilfield gas storage has started gas production since November 2020, which has protected people for a warm winter.
READ MORE
-
Technical team of HC is in the process of designing a natural gas wellhead desander for the Kazakhstan project. The equipment includes the cylinder, cyclone and sand collecting drum, so it is also called cyclone desander.
READ MORE
-
The price of international crude oil futures rose significantly on the evening of July, driven by the news of the attack on a storage facility in Saudi Arabia, a big oil producing country, and broke through the $70 per barrel round level in the day
READ MORE
-
With the development of gas field, the number of production wells is gradually increasing. In order to make accurate measurement of water and gas production of gas wells
READ MORE
-
The three-phase separator designed and manufactured by HC for Bangladesh project has reached the final stage of production. The equipment is composed of high-precision, direct display, gas flowmeter with pressure and
READ MORE