-
British customer signed the order agreement for the safety valve and gate valve with us after several times of communication. The factory has been put into production after the confirmation of relevant details and delivery conditions.
READ MORE
-
Dirt will form inside after the heat exchanger runs for a long time, and the accumulation of dirt will make the section of the internal channel of the heat exchanger smaller or even blocked, which will result in insufficient cooling water flow and
READ MORE
-
In all stages of well testing operation, such as exploration well, hydraulic fracturing backflow and trial production process, it is the key to accurately calculate reserves and oil and gas recovery.
READ MORE
-
As the development of exploration of gas reservoir, the contradiction faced in the exploitation of low-permeability gas reservoir has been increasingly prominent, especially for low-permeability carbonate gas reservoir.
READ MORE
-
The design and manufacturing team of HC Petroleum Equipment provides customized solutions for customers with specific requirements, especially in regions using local standards, such as Russia and CIS countries. At present, HC
READ MORE
-
There are six factors that will influence the natural gas and liquefied natural gas (LNG) market in Asia-Pacific region in 2020.In 2019, the global LNG market is heavily dependent on Europe, which is leading to an oversupply.
READ MORE
-
Since the meeting at ADIPEC, the customer of an oilfield service company in Malaysia who has been deeply impressed by HC Petroleum Equipment, and satisfied with our products and services as well as expressed their preliminary cooperation intention.
READ MORE
-
Since the outbreak in Wuhan, HC has received concern and greetings of customers and friends from Egypt, Russia, the United States, the United Arab Emirates and other countries.We would like to express our gratitude to all the customers
READ MORE